Short-term Capacity Increasing Decision Method for Oil-immersed Transformer Considering Comprehensive Risk

ZHANG Yu,HE Di,XU Yibin,GUO Chuangxin,DU Xiuming,BAI Demeng
DOI: https://doi.org/10.7500/AEPS20161121007
2017-01-01
Abstract:It is conducive to increasing transformer capacity to help relieve the long-term contradiction between power supply and demand and the short-term emergency demand.In existing studies, transformer capacity increasing (TCI) decision is based on the hottest spot temperature (HST) and failure rate (FR).In consideration of operation risks, a short-term TCI method including two stages is proposed.Firstly, a preliminary TCI decision constrained by HST and FR is generated.Then, the economically optimal TCI decision between the preliminary TCI decision and full-loaded operation is searched for as the final decision on the basis of economic risk verification according to profit and loss of power enterprises and community.In a case study, the influence of transformer service time and planned TCI time on the short-term TCI results is discussed.And the proposed method is compared with the current TCI plan of power enterprises.The results show that the short-term TCI plan can be made flexibly with the proposed method that attends to both security and economy.
What problem does this paper attempt to address?