Research on the Cost of the Whole Life Cycle of the Transformer
Yong Yang,Jing-jing Zheng,Pei-dong Du,Jing Peng
DOI: https://doi.org/10.2991/iceemt-16.2016.99
2016-01-01
Abstract:To solve the current energy supply and demand tension grid must intelligent control to the operation of the equipment, at the same time, to look for a new management model, to maximize energy efficiency, to achieve energy-saving power grid. Transformer is the most important power equipment, domestic study on transformer life currently mainly concentrated in the transformer life cycle cost, type selection of transformer and the transformer economic operation. In this paper, we consider transformer in the demonstration, construction, operation, maintenance, fault, and maintenance until his retirement in the whole life process, the modeling, through an example analysis to estimate the life cycle energy consumption.