Determination of Optimal Restoration Paths for Power Systems Considering Failure Risk of Restoring Transmission Lines

SUN Lei,LIU Weijia,LIN Zhenzhi,WEN Fushuan
DOI: https://doi.org/10.7500/AEPS20150214006
2015-01-01
Abstract:Putting unloaded transmission lines into operation is one of the main steps of network reconfiguration in power system restoration.Whether an unloaded transmission line could be restored successfully or not may have a significant impact on the speed of the whole restoration process.Given this background,an approach to determine optimal restoration paths for a power system is presented with the failure risk of restoring transmission lines taken into account.First,the factors having impacts on restoring transmission lines are analyzed,including the charging capacity and restoration time of the transmission lines.Then,the relative probability of line restoring failure is defined.Based on the severity of line restoring failure,the line restoring risk is defined.Considering that the uncertainty of the restoration time of the lines leads to the uncertainty of the line restoring outcome,two robust optimization models are presented to minimize the total line restoring risks,which are applied to the “series" and “parallel" restoration stages,respectively.The highly efficient commercial solver CPLEX 12.2 is next employed to solve the developed two robust optimization models.Finally,the New England 10-unit 39-bus power system is served for demonstrating the basic characteristics of the developed models and methods.
What problem does this paper attempt to address?