Two-stage Power Network Reconfiguration Strategy Considering Node Importance and Restored Generation Capacity

Can Zhang,Zhenzhi Lin,Fushuan Wen,Gerard Ledwich,Yusheng Xue
DOI: https://doi.org/10.1049/iet-gtd.2013.0065
2014-01-01
IET Generation Transmission & Distribution
Abstract:Network reconfiguration after complete blackout of a power system is an essential step for power system restoration. A new node importance evaluation method is presented based on the concept of regret, and maximisation of the average importance of a path is employed as the objective of finding the optimal restoration path. Then, a two-stage method is presented to optimise the network reconfigurati...