The Analysis of 1 000 MW Double Reheat Tower Boiler Economizer Vaporization

Lin WANG,Hui LIU,Chao LIU,Kang LI,Jing-hui GAO
DOI: https://doi.org/10.3969/j.issn.1002-6339.2017.06.006
2017-01-01
Abstract:In order to solve the problem of water evaporation in the outlet of the economizer at start-up initial stage of 1 000 MW double reheat boiler,the comprehensive analysis has been carried out on structural layout of economizer which located at front & rear wall and thermal environment.Result shows that split design of economizer,partition wall at the upper part of the furnace,high feed-water temperature,large water pressure head loss and higher furnace flue gas temperature at the start-up initial stage,is the main reason for the economizer vaporization of the double reheat tower type boiler.With the help of organizing reasonable combustion,reduce the position of centre of the flame,increasing the water flow,optimize the way of water supply,opening the turbine bypass and economizer exhaust valve,putting high and low pressure heaters into service slowly,the outlet water of economizer is ensured unsaturated,and the front wall and rear wall economizer vaporization problem is solved well during the initial start stage.Relevant start-up and running experience can provide practical reference for subsequent secondary reheat unit.
What problem does this paper attempt to address?