Feasibility Study of Municipal Solid Wastes Incineration Power Generation in Jinhua

YANG Guan-nan,MA Zheng-yi
DOI: https://doi.org/10.3969/j.issn.1004-3950.2005.05.002
2005-01-01
Energy Engineering
Abstract:The production of Jinhua urban municipal solid wastes(MSW) is about 450 ton per day.The production increase with 15% ratio every year.Up to date,landfill method is used to treat the MSW,but the landfill site will be saturated after 2~3 years.The new landfill location is very difficult to choice.MSW incineration is a feasibility way of waste resourcable and volume reduction.To treat the Jinhua MSW,which has the feature of high water content,low heat value,auxiliary coal is added into circulating fluidized bed waste incineration boiler to improve heat value of mixed fuel and clean combustion.Combine with Zhejiang Bada Thermo Electricity Ltd.Company's equipment and experience mechanic,construction of MSW incineration plant is a feasible way of waste to energy.
What problem does this paper attempt to address?