Preliminary Study on Nuclear Fuel Cycle Scenarios of China Before 2020

LIU Xue-gang,XU Jing-Ming,Zhu Yong-jun
DOI: https://doi.org/10.3321/j.issn:0258-0918.2005.02.004
2005-01-01
Abstract:Based on current status and near-and medium-term development program of nuclear power in China, three different scenarios of nuclear power before 2020 are suggested in this paper. The demand of natural uranium and separative work, the amount of spent fuel, plutonium and minor actinides arising from nuclear power reactors are calculated according to the scenarios. The results indicate that up to 2020 the accumulative requirement of uranium and spent fuel will be 53558-67631tU and 514-772 tHM respectively. The requirement of uranium resource, waste generation and the construction of nuclear fuel cycle for future nuclear power should be concerned.