Storm water flooding process simulation in a nuclear power plant with SWMM

Yi Zhou,Minghui Yu,Yichi Zhang,Junzhong Wu,Pinya Deng
DOI: https://doi.org/10.13789/j.cnki.wwe1964.2015.0286
2015-01-01
Abstract:It is necessary to simulate possible flooding process during heavy rain in a nuclear power plant.Taking a nuclear power plant as an example,the drainage condition of plant was com-pared with a municipal drainage system,which showed that it had some characters including stric-ter requirement,poorer surface permeability and no stormwater pumping station.As a result,modeling needed some reasonable methodologies to deal with these characters.Water level changing with time in conduit sections,flooding conditions in nodes and other consequences could be obtained by SWMM simula-tion calculation.Furthermore,the flooding depth changing process around the nodes could also be simula-ted as well.The analysis of calculation results showed that both heavy rains return period and discharge water level should be paid more attention to and a reasonable standard in design and checking should also be built up.The flooding peak in the upstream and downstream appeared almost simultaneously in this case,so there was no storage volume in the system.The surface runoff time values had great influence on the result if a reasoning formula method was used.
What problem does this paper attempt to address?