Numerical simulation of influence of Maoyang bridge in Wuzhishan on flood control of Maoyang river

Wei HUANG,Guoru HUANG
DOI: https://doi.org/10.11705/j.issn.1672-643X.2014.06.031
2014-01-01
Abstract:In order to analyze and compare the effect of constructiom of Maoyang bridge on river flood in different schemes,the paper built a 2D hydrodynamic model which took FVM of triangle mesh to resolve the model ,and simulate the variations of water level and velocity and direction of this project .Result indi-cated that the original project plan has severe effect on the banked -up of water level ,flow velocity and state.The biggest high of banked -up is 59.3 cm, and the largest increase value of flow velocity is 1.909 m/s.The improved scheme obviously reduced the adverse effects of water level ,flow velocity and direc-tion.The highest banked-up of water level is 8.8cm.The maximum increase value of flow velocity is 0. 635 m/s.The change ranges of both are small and can't basically threat the operating safety of the river .
What problem does this paper attempt to address?