Influence of River Connecting Project on Flood Control and Drainage Analysis Based on Two Dimensional Model

李东风,潘杰,陈海雄,张红武
DOI: https://doi.org/10.3969/j.issn.1000-1379.2016.11.008
2016-01-01
Abstract:Plain river network has the characteristics of flat riverbed, more block water reaches, weak water flow and poor flood control and drainage. To make full use of water hydrodynamic potential energy and find out the most serious block water river reach and put forward some countermeasures to eliminate resistance water problems and speed up the flood control and drainage, two-dimensional model was used to sim?ulate the water flow in the current situation and the most serious block water of the river was found out by comprehensive analysis. Measures of using river connecting engineering was put forward to lower flow resistance to speed up the flow of water and the water flow was also simula?ted. From the analysis on the time and space engineering measures to speed up the flow of influence and by comparing the numerical simula?tion results of current and project situation, the influence of speeding up the water flow was analyzed from temporal and spatial aspects. The result indicates that the maximum velocities before and after the project are 0.089 m/s and 0.145 m/s respectively. The river connecting engi?neering measures can speed up the water flow and the flood control and drainage.
What problem does this paper attempt to address?