Optimization test of hydraulic flashboard permeable spur dike group based on reducing jetty head scour depth

Kai ZHANG,Ke-bin SHI,Yu-jian LI
DOI: https://doi.org/10.3969/j.issn.1005-8443.2016.06.008
2016-01-01
Abstract:In order to explore the optimal design parameter and layout scheme of hydraulic flashboard perme?able spur dike group, the single factor experiment was carried out on the basis of the changes of the layout angle, permeable rate of hydraulic flashboard and spur dike length of the third spur dike and the variation of space be?tween the second and the third spur dike. The regression equation between single factor and the scour depth of the third jetty head was concluded. The best test level in each group of single factor test result was chosen, and the L 9 (34)orthogonal experiment design table was used to design the orthogonal experiment of 4 factors and 3 levels. The results of orthogonal experiment show that the influences of 4 factors on the third jetty head scour depth are in the order of the spur dike length>spur dike spacing>the permeable rate of spur dike>layout angle. In order to reduce the jetty head flush, the optimal design parameter and layout scheme of hydraulic flashboard permeable spur dike group could be listed as follows:the ratio of the first spur dike length, the second spur dike length and the third spur dike length to river width is 0.25, 0.21 and 0.21 respectively. Both the first and the second spur dike permeable rates are 30%, while the third spur dike permeable rate is 20%.The ratio of the spacing between the first spur dike and the second spur dike to the length of the first spur dike is 3, and the ratio of the spacing between the second spur dike and the third spur dike to the length of the second spur dike is 2.The layout angle of the first, the second and the third spur dike is 60°.
What problem does this paper attempt to address?