Optimization Test of Jetty Head Scour Depth of Double Hydraulic Flashboard Permeable Spur Dike

张凯,李玉建,任志,吴福飞,侍克斌,王欣
2017-01-01
Abstract:Hydraulic flashboard permeable spur dike is a new kind of spur dike,local scour of jetty head about hydraulic flashboard permeable spur dike seriously affects the stability and safety of hydraulic flashboard.Double spur dike is a unit of spur dike group.So,layout and design of double spur dike is very important.Under the arrangement of first spur dike,the single factor experiment was carried out by changing groin spacing,layout angle,the permeable rate of hydraulic flashboard and the length of the spur dike.The regression equation between single factor and the depth of the second jetty head scour was obtained.By choosing the best test level in each group of single factor test results,the orthogonal experiment of 4 factors and 3 levels was designed by using the L9 (34) orthogonal experiment design table.The results of orthogonal experiment show that the influence extent of the depth of the second jetty head scour about the 4 factors is sorted as:groin spacing>the length of the spur dike>the permeable rate of spur dike>layout angle.In order to reduce the jetty head flush,the optimal design parameter and layout scheme of double hydraulic flashboard permeable spur dike can be listed as follows:the groin spacing is 90 cm,the length of the first spur dike is 30 cm,the length of the second spur dike is 25 cm,the permeable rate of first and second hydraulic flashboard is 30%,the layout-angle of first and second spur dike is 60°.
What problem does this paper attempt to address?