Study on the Effect of Regulation Engineering of Wuqiao Waterway

Li CHEN,Jie HUANG,Xiao-hua HE,Jie-yu HAO,Yan-rong PING,Min ZHOU
DOI: https://doi.org/10.3969/j.issn.1008-701X.2014.05.009
2014-01-01
Abstract:Wuqiao waterway is a straight narrowed waterway located in the middle reach of the Yangtze River , which is one part of wuhan reach . Hanyang side bar deposits in dry season so that the scene of the obstruction of the navigation channel appears because of the serious twist of channel . The regulation project was started after the Flood Season in 2010 . this paper analyses the variation of scouring and silting after regulation . The results shows :scouring and silting coexist in wuqiao waterway ;the amounts of channel scour and fill is very close to silt-discharge condition of the upper reach ;the river regime is stable , the tendency and the location of talweg are essentially unchanged . There is a certain amount of swing in the transition range from left to right at the Qianzhou tail . As a key bottomland , the body of Qianzhou is integrally stable , while its tail moves down . The rule of “erosion works in flood period and deposition works in dry period”still applies to Hanyang side bar during the year and the annual variation of Hanyang side bar is great When it meets the extremely adverse condition of a long period of low flow after flood season in 2013 , the navigation obstruction still exists and dredging measures still needs to be taken .
What problem does this paper attempt to address?