Research on Risk Control of Construction Safety in High Cut Slope of Expressway

Junyong LIN,Yimin WANG,Zhaoyang WANG
DOI: https://doi.org/10.11731/j.issn.1673-193x.2017.03.030
2017-01-01
Abstract:To avoid the phenomenon of partial slump in the construction process of slope, taking the cut slope at K443+260~K443+585 of the expressway from Renhua to Boluo in Guangdong province as the research object, the reasons causing the partial slump of slope were analyzed through field survey and data investigation.The safety stability and deformation law of slope for the further construction were studied by using the finite element strength reduction method, so as to provide the basis for controlling the safety risk of slope.The results showed that the fissure development, water|weakening and low strength of slope rock body are the main reasons causing the partial slump of slope.During the excavation process of slope, if the support measures have not been taken timely, the safety coefficient of slope will decrease by 10%, which is bad for the stability of slope.The safety of slope can be guaranteed by adopting the principle of excavation followed by support at once.It is necessary to apply the safety risk control measures during the construction of high cut slope in expressway, such as arranging the construction procedure reasonably, making well the waterproof and drainage measures, and strengthening the construction monitoring.
What problem does this paper attempt to address?