Interaction Between Tracks and Continuous Rigid-frame Bridge Carrying Railway Under Action of Shrinkage and Creep

YAN Bin,PAN Wenbin,MENG Yajun,Xu Qingyuan
DOI: https://doi.org/10.3969/j.issn.1001-8360.2017.05.015
2017-01-01
Abstract:Based on a simulation model for (72+128+72) m large-span continuous rigid-frame bridge and double-line ballastless track system, the interaction between large-span continuous rigid-frame bridge and track was revealed under the action of shrinkage and creep.Following the analysis on the influence of the main design parameters, such as shrinkage and creep model, concrete curing condition, on system force and deformation, the feasibility of adopting thermal effect to replace calculation of shrink and creep effect was discussed.The study showed that the system force and deformation under the action of shrinkage and creep effect gradually increased with the extension of service time.The rail stress and vertical displacement generated by shrinkage and creep cannot be completely contained by those calculated from 30 ℃ temperature drop of the beam.The method that shrinkage and creep can be simulated by beam temperature dropping of 10 ℃ recommended by the "Code for Design of High Speed Railway" is not applicable to track-bridge interaction analysis under the action of shrinkage and creep.
What problem does this paper attempt to address?