Reasons of bored pile s plugging and countermeasures

Jun ZHANG,Jian LI
DOI: https://doi.org/10.3969/j.issn.1002-4972.2015.08.023
2015-01-01
Abstract:Plugging often happens during construction of bored piles,which affects the engineering quality or leadstopile sscrapping.Toreducethisrisk,wecarryoutatheoreticalanalysisonthepluggingreasonsandtake multiple measures such as due vibro-flotation in practice.Moreover,we develop the vibration hammer impacting method and re-insert catheter.The engineering effect is remarkable,and it may serve as reference for other projects.