Uncertainty Analysis of MIKE SHE Hydrologic Model Parameter

宫辉力,郑震,张静
DOI: https://doi.org/10.3969/j.issn.1000-1379.2015.01.006
2015-01-01
Abstract:In the process of building a model,some basin feature parameters are expressed inaccurately. It is an important way to construct model and estimate the uncertainty parameter for evaluating the uncertainty of the overall output. It used the runoff data of the Dongdaqiao Hydrological Station in Guishui River basin as the research object to estimate the uncertainty of runoff parameters. The results show that the parameters of larger uncertainty include PER,SP,C1,C2,C3 and the smaller parameters include KsF,KsI,IT and TD. More than 50%observations in calibration period fall into the corresponding uncertainty bounds,suggesting a similar level of model performance. The simula-tion results are better corresponded with the measured flow,but still need to be improved for higher accuracy.
What problem does this paper attempt to address?