Research on Scheduling System Involving Hydropower for Emergency Flood in Xijiang River Basin

雷晓辉,王方方,宋巍,王旭,彭勇,江哲
DOI: https://doi.org/10.3969/j.issn.1007-2284.2017.04.045
2017-01-01
Abstract:In order to control the emergency flood in Xijiang River Basin, this paper establishes flood control optimization scheduling model considering large hydropower reservoirs emergency.The model aimed at solving the problem of emergency flood in Xijiang River Basin, making full use of the reservoirs and giving play to the role of regulation of hydropower stations to improve the capability of Xijiang River Basin.The model takes the beginning time, ending time and safety discharge as optimization variables, aiming at gaining the maximum peak clipping effects and responding to the emergency flood.At the same time, the model implements the universal development, which can choose dynamic control sections and apply different types of floods.In this paper, by analyzing the results of flood dispatching, it found that the emergency optimal operation enables the decrease of peak flow to increase by 30% more than conventional scheduling.The result shows that the hydropower stations herein optimization scheduling model has a great significance for the Xijiang River Basin in controlling emergency flood.
What problem does this paper attempt to address?