Distribution of Maximum Turbidity and Its Influence on the Sedimentation of North Passage Before and after the Construction of the First Stage of Yangtze Estuary Deepwater Channel Regulation Project

阮伟,张华,周海
DOI: https://doi.org/10.3321/j.issn:0468-155x.2005.05.010
2005-01-01
Abstract:Based on the current and suspended sediments data, fluid mud, relief maps of sea bed, siltation along navigation channel, etc., the change and distribution of maximum turbidity along North Passage before and after the Construction of the first stage of Yangtze Estuary Deepwater Channel Regulation Project and its influence on the sedimentation along navigation channel in North Passage are summarized and studied in this paper. In addition, the change of mouth bar in North Passage before and after the construction is summarized and its future evolution is studied. The results can provide a valuable reference for the Construction of the Second and Third stage of Yangtze Estuary Deepwater Channel Regulation Project and some arguments on such problems as the evolution of maximum turbidity in North Passage and the effect of the first stage of Yangtze Estuary Deepwater Channel Regulation Project on the change of mouth bar, etc., are clarified.
What problem does this paper attempt to address?