Study on the Early Warning of PPP Project Risk Based on Rough Set and BP Neural Network

Daoping Wang,Zhe Wang,Xiaojuan Sheng
DOI: https://doi.org/10.2991/ifeesm-17.2018.269
2018-01-01
Abstract:The risk of PPP project is one of the issues the most importantly focused by all participants in the project management; the establishment of a scientific risk early warning system is an effective way to control the risk of PPP projects. Based on the design of the PPP project risk early warning index system, the evaluation indexes were subtracted with rough set; a nonlinear simulation early warning model of PPP project risk was constructed with BP neural network; the network model was simulated through the sample data to obtain a good simulation effect.