Comments on “A Bicriteria M-Machine Flowshop Scheduling with Sequence-Dependent Setup Times”

Dehua Xu,Yunqiang Yin
DOI: https://doi.org/10.1016/j.apm.2011.01.034
IF: 5.336
2011-01-01
Applied Mathematical Modelling
Abstract:The purpose of this paper is to point out that the programming model proposed by Eren [A bicriteria m-machine flowshop scheduling with sequence-dependent setup times, Appl. Math. Model. 34 (2010) 284–293] is incorrect. We propose a mixed 0–1 programming model for the same scheduling problem based on their model.
What problem does this paper attempt to address?