Preparation of beta TCP scaffold with oriented structure

W Xu,JM Tian,C Wang,LM Dong,QF Zan
2007-01-01
Rare Metal Materials and Engineering
Abstract:Multilayer beta-TCP scaffold was prepared by using three-dimensional gel-lamination technology with several kinds of slurries. Using 30% slurry as materials and sintered at 1150 degrees C for 2 hours, beta-TCP scaffold with oriented structure was achieved which has the compression strength of (8.2 +/- 0.64) MPa in the orientation vertical to the layers while the compression strength of (25 +/- 3.4) MPa in the orientation parallel to the layers.
What problem does this paper attempt to address?