Commissioning technology research of spent fuel storage residual heat removal system of HTR PM

Jinhua Wang,Yue Li,Bin Wu,Yuchen Hao,Haitao Wang
DOI: https://doi.org/10.1299/jsmeicone.2019.27.1211
2019-01-01
Abstract:The Pebble Module High Temperature gas-cooled Reactor demonstration project (HTR-PM) has entered the process system commissioning stage after years of design and construction. As one of the fourth generation nuclear power plants with inherent safety technology, HTR-PM adopted dry in-site storage technology for spent fuel based on unshielded canister and dry storage silo, which is different with the wet storage method used in PWR. So all of the design, installation and commissioning of the spent fuel residual heat removal system for HTR-PM are innovative technologies. From the point of view of commissioning technology, this paper will study the key technologies and solutions in commissioning process of the spent fuel residual heat removal system. The spent fuel elements of HTR-PM are stored in the stainless steel spent fuel canister, and the transfer and hoisting of the spent fuel canister are realized through the operation of the ground crane and shield cover equipment set. The storage canister full of spent fuel would be stored in spent fuel storage silos, each silo could lay five spent fuel canisters. The spent fuel repository is composed of buffer storage region and intermediate storage region. In normal operation, active ventilation is adopted in the spent fuel buffer storage region, and active ventilation is carried out through the centrifugal blower to discharge the spent fuel residual heat. The main test object described in this paper is the residual heat removal system in the spent fuel buffer storage region. The spent fuel residual heat in the intermediate storage region would be removed through natural ventilation completely. All of the spent fuel residual heat removal system in the spent fuel buffer storage region and intermediate storage region has inherent safety characteristics. The main purpose of the commissioning test of the spent fuel storage residual heat removal system in HTR-PM is to investigate the ventilating system commissioning characteristics for the spent fuel storage silo under the centrifugal blower operating condition. The ventilation test in the silo includes all kinds of operating conditions with different number of spent fuel canisters in each silo. The flow measurement in silo under the condition of non-uniform flow in silo is realized through the commissioning test. The movement and hoisting of the spent fuel storage canisters in silo are realized through the operation of the ground crane, so as to realize the wanted distribution condition of different number of storage canisters in the spent fuel storage silo. The residual heat removal centrifugal blower would be in operating condition, and the air flow rate in the storage silo and the typical differential pressure between inlet and outlet of the silo would be measured. All of the working conditions of the test could be realized through the operation of the canister and other equipment, or through the usage of special designed equipment, to achieve the simulation of the real operating conditions. The commissioning technology of the spent fuel storage residual heat removal system of high temperature gas cooled reactor demonstration project is the key to verify the safety of large-scale spent fuel residual heat removal ventilation cooling technology. As one of the basic test for spent fuel dry storage system, it will provide important basis for the design, commissioning and operation in subsequent developing stage of the spent fuel dry storage system.
What problem does this paper attempt to address?