Design of chinese modular high-temperature gas-cooled reactor htr-pm
Zuoyi Zhang,Zongxin Wu,Yuanhui Xu,Yuliang Sun,Fu Li
2004-01-01
Abstract:Modular high-temperature gas-cooled reactor (MHTGR) has distinct advantages in the sense of the inherent safety, economy property, high electricity efficiency, potential usage for hydrogen production, and etc. Chinese design of MHTGR, named as High Temperature Gas-Cooled Reactor-Pebble bed Module (HTR-PM), based on the technology and experiences of the HTR-10, is under the standard design phase. And the HTR-PM demonstration plant is planned to finish the construction in 2010. The main philosophy of HTR-PM project is safety, standard, economy, and proven technology. The works in the categories of market, organization, project and technology is done in predefined order. And the biggest challenge for the HTR-PM is to ensure the economical competition while maintaining the inherent safety. As a result of optimization and compromise, a design of 450MWth annular pebble bed core is presented in this paper. KEYWORD: MHTGR, annular core, pebble bed, HTR-10, HTR-PM 0. CURRENT STATUS OF HTR Starting from the gas-cooled reactor in 1950s and advanced gas-cooled reactor in 1960s, and the high-temperature reactor Dragon in 1964, the high-temperature gas-cooled reactors have developed for nearly 50 years. And the concept of modular high temperature gas-cooled reactor (MHTGR), which is much safer than its ancestor and other type of reactors, was proposed more than 20 years ago, and was realized and verified by 10MW high-temperature gas-cooled test reactor (HTR-10) designed in China in 2000. Therefore the MHTGR is a mature reactor now. And MHTGR is very excellent in the safety, market flexibility. For safety, MHTGR eliminates the possibility of core melt and radioactive release to the environment, provides an inherent safety solution. The market flexibility is realized by the small power size of each module, multiple modules in one plant, batch and standard construction of each module, higher output temperature, possibility for many processing heat application including hydrogen production. Therefore MHTGR is very attractive and competitive in the world, many research and engineering projects are planned and ongoing, for example, the South African PBMR project, USA-Russia GT-MHR project, USA NGNP (Next generation Nuclear Power) in Idaho, HTTR in Japan, Korean HTGR plan, and Chinese High Temperature Gas-Cooled Reactor-Pebble bed Module (HTR-PM) demonstration project. It is especially urgent for China to develop and construct new nuclear power plants. The economy grows continuously, the energy demand increases continuously, the shortage of electricity, oil and coal becomes serious and serious, the environment pressure (green house gas and air pollution) increases continuously, thus nuclear power becomes inevitable for China . Because of the distinguished advantages of MHTGR in safety, and the success of HTR-10 project , HTR-PM project becomes DESIGN OF CHINESE MODULAR HIGH-TEMPERATURE GAS-COOLED REACTOR HTR-PM #D15 -2 -urgent, practical, feasible for China . And this is also the main topic of this paper. 1. THE PHILOSOPHY OF HTR-PM PROJECT The main philosophy of HTR-PM project is safety, standard, economy and proven technology. The “safety” requirement means the HTR-PM will comply with the inherent safety principles of MHTGR, which must remove the decay heat passively from the core under any designed accident condition, and keep the maximum fuel temperature below 1600°C so as to contain nearly all fission products inside the SiC layer of TRISO coated fuel. Therefore it eliminates the possibility of core melt and large release of radioactive into environment. The “standard” requirement means that the design of the HTR-PM nuclear power plant, especially the nuclear island, must be standardized and modularization, so multiple modules can be constructed in a batch and standardized way in one site or in many sites. The standard design of HTR-PM try to solve this problem as discussed later. The “economy” requirement means that the designed power plant must be competitive with other type of energy sources, including the current PWR, while providing more safety margin and application flexibility. This is the most serious challenge for us. The “proven technology” requirement means the HTR-PM will adopt as much as possible the proven technology. According to this guideline, the HTR-PM design will take HTR-10 as prototype reactor, including the system configuration, the layout, the fuel element technology, the design, manufacture and construction experience of HTR-10, and take HTR-MODUL design as a reference and starting point, and use the proven, high efficient, conventional steam turbine proven and used in coal plant as the solution of the conventional island. The work done and been doing on HTR-PM project can be divided into four categories, namely the market, organization, project, and technology. The market category concerns the market requirement and the market chance. Now China is eagerly searching the new energy sources for its rapid economy growth, the nuclear energy has big chance to develop. In current stage, cheap and safe electricity is the main object for nuclear energy, in future, the hydrogen production, the sea-water desalination may become main stream. Although mature PWR is the main stream for the new Chinese nuclear power plants, as the Chinese national policy and world trend, but MHTGR is very attractive for its safety, higher electricity efficiency and possibility for hydrogen production. And through HTR-10, China has achieved full intelligence property and know-how of the high temperature reactor. So Chinese government agrees to support HTR-PM project in the sense of both the policy and finance. Therefore HTR-PM is suitable for the Chinese market, and finds its position in Chinese market, that is the supplement of PWR for electricity production in current stage and main source for hydrogen production in future. In the organization category, a development team includes all aspects of Chinese nuclear industry is set up to push forward the HTR-PM project, including the research, design, construction, manufacture, operation, and utility. The kernel of this team is Institute of Nuclear and New Energy Technology (INET) of Tsinghua University, which owns the experience and experts to design, construct, operate the HTR-10, and is responsible for the research, design and technology development of the nuclear HTR2004 Beijing, CHINA, 2004. 9 -3 -island of HTR-PM. The second level of this team is a future Architecture and Engineering (AE) company for HTR-PM which is responsible for the engineering design, main components supply, all issues about the construction. This future AE company is set up just for short time, and is a joint venture company between Chinese Nuclear Industry Construction Company, which is responsible for the construction of all Chinese nuclear power plants, and Tsinghua University, which can provide HTR design technology. This AE company will be responsible to combination of design, manufacturer, construction, utility together to provide a complete HTR-PM power plant to utility. Another part of the team is the future utility company. This company will be a joint venture company among a Chinese electricity company, namely Huaneng Group Company, and nuclear industry company, namely the Chinese Nuclear Industry Construction Company, and Tsinghua University, and other local investors located near the final site of the HTR-PM power plant. Maybe the shares of the stock will be expanded further to combine more positive strength for HTR-PM. This utility company will be responsible for the issues of marketing, financial, site selection, and etc. For project category, a roadmap for the demonstration plant is set up, a long term roadmap of the HTR-PM is in the preliminary stage. For the demonstration plant, two parallel line of project is outlined. One is the reactor itself, including the site selection, standard design, experiment verification, safety review, demonstration plant, and future batch construction of HTR-PM. Another line of project is for the nuclear fuel plant, which is very different from the fuel plant for PWR. This work is outlined as, to expand the size of the plant, to stabilize the production technics, to produce fuel elements for physical critical of demonstration nuclear power plant, and produce more fuel elements for operation of demonstration plant and future power plants. The long term development project concerns the development of new technology, including helium turbine (prototype will be tested in HTR-10), hydrogen production technology (technology developing in laboratory), gas fast reactor technology, very high temperature gas-cooled reactor technology, and etc. For technology category, the main work is to finish the HTR-PM standard design which is based on the enveloping or reference site condition. This idea of standard design is like the standard design of ABWR done by GE company. The purpose of standard design to hurry up the design process and improve the design quality. According to Chinese rules, the design of nuclear power plant must follow the stages of: 1) preliminary feasibility study which chooses the site, outlines the conceptual scheme, analyzes the economic feature, forms the utility company, outlines the financial source, 2) feasibility study which includes the site seismic and geology report, site choice safety analysis report, environment impact analysis report and project feasibility study report itself, 3) preliminary design aimed at to get the construction license, 4) final construction design. As a new type of nuclear power plant, the first two stages are too lengthy and the government permission must be obtained one by one. Therefore the standard design which uses the enveloping site condition and reaches the depth of preliminary design can make the design of the HTR-PM more detailed and at early stage. From another viewpoint, MHTGR requires the standardization of t