Optimization of Essential Transmission Equipment Selection in Offshore Wind Farm Clusters Considering Truncation Risk of High Wind Speed

WANG Jian,LU Zongxiang,QIAO Ying,XIE Zhenjian,SUN Wentao,WANG Haiqian
DOI: https://doi.org/10.13335/j.1000-3673.pst.2017.0060
2017-01-01
Abstract:Essential transmission equipment selection has significant influence on economy of offshore wind farms and clusters. Wind resource character is a key element of this issue. Considering very small proportion of high speed interval in offshore wind resource cumulative distribution curve, an equipment selection method based on truncation risk of high wind speed is presented in this paper. An optimization model with synthetical consideration of equipment cost and risk is proposed for essential equipment selection. Solution method for the proposed model is given. Besides, influence of distance to shore and electricity price is analyzed. Results illustrate feasibility of the optimization method in reducing total cost in transmission equipment selection in offshore wind farms and clusters.
What problem does this paper attempt to address?