Collection and transmission planning for large offshore wind power base

Zongxiang Lu,Hai-Bo Liu,Ying Qiao,Le Xie,Chanan Singh
2024-01-01
Abstract:Offshore wind power planning in China thus far has generally inherited the principles and thinking of onshore wind power planning. Mid- to offshore wind power access could incur a cost far higher than that of onshore wind generation, accounting for 15%–30% of the total investment. Sea state resources, corridor resources, landing conditions, and submarine cable wiring all face materially contrasting constraints to onshore wind power, necessitating dedicated planning efforts for offshore wind power. In this chapter, a planning framework for the sequential and cascaded development of mid- to offshore wind power bases is proposed, and a tiered master planning approach featuring on-site, cluster, and AC/DC transmission is established, filling the gap in transmission planning of large-scale mid- to offshore wind farm clusters. Firstly, location optimization of offshore hub substations based on a steepest descent method is established and explaining its specific implementation methods. Secondly, an improved minimum spanning tree algorithm is used to find a topology connection method for the collector system with the optimal length of submarine cable, which makes the cost optimal. Finally, the optimization model of transmission equipment selection considering the risk of high wind speed truncation is established, and the topology optimization modeling method of offshore wind power cluster transmission systems based on the improved ant colony optimization algorithm is proposed.
What problem does this paper attempt to address?