The simulation of stripping extraction process for cyciae-100 *

Shizhong An,Fengping Guan,Ming Li,Sumin Wei,Tianjue Zhang,Jianjun Yang,P. R. China
2015-01-01
Abstract:A 100 MeV Hcompact cyclotron is under construction at China Institute of Atomic Energy (CYCIAE-100) and the first beam has been got on Jun. 25th this year. The proton beams of 75 MeV 100 MeV at intensity of 200 μA will be extracted in dual opposite directions by charge exchange stripping devices. The two main parameters for the stripping extraction are the positions of stripping foil and combination magnet. For CYCIAE-100, the center of combination magnet is fixed at (R=2.75 m, θ=100°) and the extracted radii decide the positions of stripping foil for different extracted energies. In order to analyze the extracted proton beam parameters, the stripping extraction process for CYCIAE-100 is simulated in detail in this paper. The simulation is mainly done for the different RF acceptance or acceleration phase width. Due to the simulation results, the extraction turns are more for the large phase width and it will be reduced effectively with small phase width. The transverse beam distribution and the extracted beam profile are not affected by the initial phase width due to the simulation, that’s the characters of the cyclotron with the stripping extraction mode.
What problem does this paper attempt to address?