The construction progress of beijing radioactive ion-beam facility

Tianjue Zhang,Baoqun Cui,Chaohua Peng,Zhenguo Li,Yinlong Lu,Fang Yang
2013-01-01
Abstract:The Beijing Radioactive Ion-Beam Facility (BRIF) being constructed at CIAE consists of a 100 MeV high intensity cyclotron CYCIAE-100, an isotope separator on line (ISOL) system with a mass resolution of 20000, and a superconducting booster (SCB). The construction of the main building started on April 28, 2011 and the roof was sealed on Jan. 16, 2012. The on-site installation conditions have been ready since Sept. 27, 2012. Up to now, the fabrication of all major components for CYCIAE-100 have been completed, including the main magnet system, the RF system, ion source and injection, main vacuum, etc. For the ISOL system, the equipment fabrication has been completed and magnetic mapping and shimming is being performed on the large-scale analysis magnet. The fabrication of the major components for the SCB system has been accomplished as well, and the work on copper-niobium sputtering is under way. At present, the installation and assembly is in full swing and the beam commissioning is predicted to be finished in mid 2013. The first beams of CYCIAE-100 are expected by the end of 2013.
What problem does this paper attempt to address?