Experimental study of end-plate connections between box-section columns and Ⅰ-section beams

CHEN Xuesen,SHI Gang,WANG Zhe,WANG Qiong,ZHANG Hongliang
DOI: https://doi.org/10.14006/j.jzjgxb.2017.08.012
2017-01-01
Abstract:Bolted connections with box-section columns and Ⅰ-section beams are difficult to use.To solve this problem,an end-plate connection form between box-section columns and Ⅰ-section beams,as well as three prefabricating techniques for this connection form,was proposed.One monotonic-loaded full-scale specimen,as well as three cyclic loaded full-scale specimens with different prefabricating techniques of open-side-window,open-front-window and cutoff respectively,were tested to obtain the moments,rotations,inter-story drift ratios and strain distributions of critical sections of the joints.The resistance,stiffness,rotation capacity,energy dissipation capacity and failure modes of the connections were analyzed.Also,the influences of different prefabricating techniques were compared.According to the results,the mechanical properties are similar for the connections prefabricated by different techniques.All the specimens show satisfactory rotation capacities and good ductility,and the rotations of the connections are mainly caused by the bulge of the column flanges.All of the three prefabricating techniques can satisfy the requirements for seismic design,and the prefabricating methods of open-side-window and cut-off are recommended as preferred methods because of the better behaviors.
What problem does this paper attempt to address?