Multi-Objective Flexible Job Shop Scheduling Problem Considering Machine Switching Off-On Operation

Qihao Liu,Quan-Ke Pan,Liang Gao,Xinyu Li
DOI: https://doi.org/10.1016/j.promfg.2020.01.353
2019-01-01
Procedia Manufacturing
Abstract:As the environmental awareness and the pressure of energy shortage, the current manufacturing industries begin to pay great attention to energy efficiency in manufacturing system. Flexible job shop scheduling problem (FJSP) has great potential in reducing energy consumption in manufacturing system, owing to the flexibility in machine selecting, job sequencing, and idle machine on-off decision making. To solve the multi-objective FJSP considering energy efficiency and makespan simultaneously, the paper proposed an improved genetic algorithm (IGA) based on non-dominated sorting genetic algorithm II (NSGA-II) and a mixed-integer mathematical model. The proposed IGA combines genetic operators of NSGA-II with some specific tabu strategies to enhance the local search ability of the algorithm. The results of numerical experiments show a certain superiority of the proposed algorithm over NSGA-II.
What problem does this paper attempt to address?