Green Job Shop Scheduling Problem With Machine At Different Speeds Using A Multi-Objective Grey Wolf Optimization Algorithm

Yuesheng Luo,Chao Lu,Xinyu Li,Ling Wang,Liang Gao
DOI: https://doi.org/10.1109/COASE.2019.8843132
2019-01-01
Abstract:Job shop scheduling problem (JSP) has been extensively researched by many scholars because of its importance in the field of industrial manufacturing. Optimization criteria, such as makespan, tardiness and earliness, are usually adopted in most conventional scheduling problems. Green criteria have received wide concern with the advent of sustainable manufacturing. However, limited attention has been paid to green criteria in JSP. Therefore, this paper addresses a green JSP with machine at different speeds (JSMS). First, a new green scheduling mathematical model is formulated for this JSMS with objectives of minimizing makespan and total energy consumption. Then, a multi-objective grey wolf optimizer (MOGWO) is presented to deal with the JSMS. Finally, to prove the effectiveness of the proposed MOGWO, we compare it with other multi-objective genetic algorithm (e.g., MOGA) on some instances. The experimental results suggest that the proposed MOGWO outperforms its competitor on this JSMS.
What problem does this paper attempt to address?