Coordinated Risk Assessment of Integrated Electric and District Heating Systems

Yixun Xue,Zhaogaung Pan,Qinglai Guo,Hongbin Sun,Wen Xiong
DOI: https://doi.org/10.1109/PESGM40551.2019.8973528
2019-01-01
Abstract:With the extensive deployment of combined heat and power (CHP) units into the electric power system (EPS), the EPS is closely integrated with the district heating system (DHS). This brings great challenge for the security operation of both systems because the failures in the EPS/DHS is likely to be transferred to the other system by coupling devices. Existing studies mainly focus on the coordination of the two systems to fully utilize the flexibility in the DHS and seldom consider the security risks caused be cascading failures. In this paper, the coordinated risk assessment of the EPS and the DHS is proposed considering the failures in the integrated system, especially the cascading failures. Based on the risk assessment in the EPS, risk indices and assessment method of the integration system are developed considering the property of the integrated system. The necessity of the coordinated risk assessment as well as the validity of the proposed method are verified in a real case in Guangzhou, South China.
What problem does this paper attempt to address?