Inner-Plant Economic Operation of Giant Hydropower and Benefit Analysis

SHEN Sheng,HUANG Weibin,LI Jidong,MA Guangwen,GUO Le
DOI: https://doi.org/10.13335/j.1000-3673.pst.2015.09.016
2015-01-01
Abstract:Nowadays, inner-plant economic operation of hydropower station has gained remarkable achievement when implemented in small and medium hydropower plants, whereas, seldom in giant hydropower plants in China. Taking peak load regulation and frequency regulation of giant hydropower plants and constraint condition of avoiding large scale output transfer into consideration, a quasi real-time output optimal distribution (QROOD) model of inner-plant of giant hydropower taking minimized water consumption as objective was established, and brought in improved spatio-temporal dynamic programming algorithm. Pubugou hydropower plant (3 600 MW) was taken as example. The results show that QROOD operation can realize considerable economic benefits, especially in reducing daily water consumption for power generation from 2.652 m3/(kW?h) to 2.585 m3/(kW?h), and increase economic benefit nearly by 2.5%. The average calculation time consumption is 0.168 s. Compared with genetic algorithm, QROOD model is an effective method to increase hydropower utilization rate of giant hydropower stations and possesses better overall optimization ability, faster calculation speed and accuracy.
What problem does this paper attempt to address?