A 0-1 Linear Programming Approach to Optimal Phasor Measurement Units Placement Considering Maximized System Observability Redundancy

BAO Wei,JIANG Xuedong,CHEN Liyue,LU Min,GUO Ruipeng
DOI: https://doi.org/10.13335/j.1000-3673.pst.2014.08.005
2014-01-01
Abstract:A 0-1 linear programming model for optimal phasor measurement units (PMU) allocation is proposed. Through solving single objective programming problem the proposed model can make the two objectives, namely the number of required PMUs and system observability redundancy, to achieve the optimum simultaneously, thus the computing process is simplified and the global optimum of the solution is ensured. The rigorousness of the proposed model is mathematically proved. The effectiveness of the proposed model is verified by simulation results of IEEE 118-bus system, IEEE 300-bus system and other standard systems. Comparing the optimized result of PMUs allocation by the proposed method and those reported in other literatures, the superiority of the proposed model is incarnated. Finally, applying the proposed model in the interconnected North China-Central China-East China power grid, the application results show that the proposed model is practicable.
What problem does this paper attempt to address?