Flexible job shop green scheduling problem with multi-speed machine

Xiuli WU,Yangjun SUN
DOI: https://doi.org/10.13196/j.cims.2018.04.006
2018-01-01
Abstract:To reduce energy consumption,an operational approach was proposed to realize green manufacturing in manufacturing companies.By considering the Flexible Job shop Scheduling Problem (FJSP) with multi-speed machines,the energy-saving and emission-reduction was realized through changing the speed without influence the makespan.A mathematical model was formulated for FJSP with multi-speed machines,and the energy consumption model was built.With the frame of Non-Dominated Sorted Genetic Algorithm (NSGA-Ⅱ),a green scheduling algorithm by considering the makespan and the energy consumption simultaneously was proposed.A variety of mutation operators were designed,and the selection for elitist and last-turn elimination were employed.The experiment results showed that the proposed approach could solve FJSP with multi-speed machines effectively.
What problem does this paper attempt to address?