Test System Upgrade for ITER Current Lead Series Production at ASIPP

Kaizhong Ding,C. Liu,Q. Du,Y. Dong,J. Wang,K. Lu,Y. Song,E. Niu,P. Bauer
DOI: https://doi.org/10.1109/TPS.2018.2871966
IF: 1.368
2019-01-01
IEEE Transactions on Plasma Science
Abstract:The Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP), is in charge of the manufacturing and testing of the 60 high-temperature superconducting current lead series to be completed at the end of 2020 for the International Thermonuclear Experimental Reactor (ITER). This paper first summarizes the testing items and testing results of the ITER lead prototypes in 2015/2016, then, based o...
What problem does this paper attempt to address?