Study on Joint Optimal Operation of Large-scale Reservoirs in Upper Reaches of Yangtze River

梅亚东,胡挺,王海,汪芸,唐海华
DOI: https://doi.org/10.3969/j.issn.0559-9342.2013.11.012
2013-01-01
Abstract:Taking the 36 reservoirs which being in operation in upper reaches of the Yangtze River as study case, the optimal operation model which targets the maximum of power output is established for the cascade stations in sub-basin and all stations in upper reaches after considering various constraint conditions. The hybrid optimization algorithm is proposed for the solution of model. The optimization results show that:(a) comparing to design values, the power generation and output compensation benefit of cascade stations in each sub-basin and all stations in upper reaches are both considerable;(b) the annual average power generation and guaranteed output of 95% frequency of all stations in upper reaches increase 17.03 TWh and 2 182.5 MW to designed objectives respectively, and also are 1.63 TWh and 348.4 MW more than the optimization of cascade stations in subbasin respectively; and(c) the Three Gorges Hydropower Station achieves the greatest compensation benefit and its generating capacity is improved after joint optimal operation.
What problem does this paper attempt to address?