EFFECT OF THE THREE GORGES PROJECT ON SEDIMENT TRANSPORTATION OF THE YANGTZE ESTUARY

陈立,吴门伍,张俊勇
DOI: https://doi.org/10.3969/j.issn.1004-8227.2003.01.011
2003-01-01
Abstract:After the completion of the Three Gorges Project, the sediment runoff of the lower reaches will decrease to a significant extent. On the basis of statistical calculations of fields data, the dependence between Yichang's and Datong's annually average sediment discharge and that of different grain size fraction have been analyzed by considering the local income. It has been concluded that about 70% of the sediment discharge through Datong depends on that amount through Yichang, in which 96% of the discharge of fine particle (d0.025 mm) through Datong comes from Yichang, and 53.8%, 73.8% for mean particles (0.025 mmd0.1 mm) and coarse particles (d0.1 mm) respectively. The construction of Three Gorges Project makes the sediment discharge through Yichang decrease to the extent of 71.7%, because of the confluence of tributary, the sediment transported through Datong to the Yangtze Estuary decrease to an extent of 40%, for the different dependence, descendant of sediment discharge for different fraction varies with grain sizes, i.e. 29.6% of fine particles decrease and meanwhile, 47.9% and 37% for mean and coarse particles respectively.
What problem does this paper attempt to address?