Study on Coordinate Control Scheme Based on Improved Synchronous Time Method for Cascade Hydropower Plants

Xu-feng YUAN,Yan LONG,Wei-jie XU,Wei XIONG,Xiao-song ZOU
DOI: https://doi.org/10.3969/j.issn.1001-1390.2014.10.010
2014-01-01
Abstract:Using the function of GPS time transfer,the paper put forwards an improved synchronous time method to ensure the clock of each power plant participating in frequency regulation synchronized.It avoids the integral difference of frequency offset,therefore can realize coordinated control for decentralized frequency regulation.Taking cascade hydropower plants in a provincial power grid as the study case,this paper puts forward a coordinated AGC control scheme based on improved synchronous time for cascade hydropower plant group,which realizes ACE control of load power frequency deviation on the tie-line of each power plant connected to the grid and keeps regional power grid frequency constant.Finally,by building a three-region equivalent model and the control scheme for cascade hydropower plants with PSCAD / EMTDC,the proposed method is tested on a 3-geneator 9-bus system to verify its feasibility and efficiency.
What problem does this paper attempt to address?