Application of Progressive Optimality Algorithm to Reservoir Water-sediment Joint Regulation

刘方,王帅,肖杨,彭杨
2012-01-01
Abstract:In order to maintain optimal power benefit and maximum effective reservoir storage capacity,water-sediment joint optimal scheduling model is established by using multi-objective programming method,which is composed of reservoir optimal scheduling model and sediment erosion calculation model.The two models are banded together though the transfer of water level parameters.Improved progressive optimality algorithm is adopted to solve the model.A practical data of Sanxia hydropower station is used for the simulation.The results show that the model is reasonable and has quick computation speed,which provides basis for study on sediment problems in reservoir optimal scheduling.
What problem does this paper attempt to address?