Research of Multi-Objective Operation of Water and Sand in Reservoir on Sandy River

刘媛媛,练继建,胡明罡
DOI: https://doi.org/10.3969/j.issn.1003-1243.2004.02.003
2004-01-01
Abstract:A multi objective operation model with GA and BP and a method to predict sediment of reservoir by using BP is presented in this paper.This is a new way to resolve the increase of electric benefit in conflict with the decrease of reservoir sedimentation.This method is based on the nonlinear and unitary theory,it can avoid “dimension disasterof dynamic programming.The effectiveness of the model is demonstrated by an example.
What problem does this paper attempt to address?