Development of Experimental Facilities for Sand Washing and Fluid Diverting of Coiled Tubing in Horizontal Wells

谢宾,陆灯云,张剑,刘静
DOI: https://doi.org/10.3787/j.issn.1000-0976.2009.11.021
2009-01-01
Abstract:As an effective means for oil and gas reservoir development,horizontal well technology has been applied rapidly and widely all over the world.In China,the horizontal well drilling is becoming mature over the last decades.However,the technology for workover operations in horizontal wells is still under development,most relying on field practice.Because of the low research level and for lack of experimental facilities for horizontal well workover in China,a set of simulating facilities were developed to study sand carrying and fluid diverting during sand flushing operation in horizontal wells by coiled tubing with the similarity principle as a theoretical basis,the horizontal wellbores at Moxi gasfield in the Sichuan Basin as the simulating objects,and the current status of application of coiled tubing in horizontal wells in the Sichuan Basin as a reference.The developed experimental facilities are proved to be able to simulate the fluid displacement,sand washing,sand carrying,fluid diverting and discharging when operating with 38.1 mm-in-diameter coiled tubing in 139 mm-in-diameter cased horizontal wellbore.
What problem does this paper attempt to address?