Transient Simulation Analysis of Coiled Tubing Gas Lift in Deep Volcanic Gas Wells

Hong-tao Zhang,Meng Cai,Wen-hai Ma,Pin-gang Ma,Nan Li
DOI: https://doi.org/10.1007/978-981-16-0761-5_196
2021-01-01
Abstract:Horizontal well gas production has become the main development technology of deep volcanic reservoirs in Daqing Oilfield. However, some of the horizontal wells have large water production and serious liquid loading in wellbores, which makes gas wells unable to produce continuously. Aiming at the technical problems that the completion structure of horizontal well completion is complicated, the depth of the well exceeds 4000 m, and the high temperature, high pressure, and CO2-containing downhole, which lead to the unsuitability of the conventional vertical well drainage gas production process and design method, a coiled tubing (CT) gas lift combined drainage process technology was studied, through transient simulation analysis and rational design of process parameters to resume normal production of gas wells. According to the horizontal well completion string structure and downhole complex working conditions, a transient analysis model of horizontal wellbore was established to simulate the dewaterging effect under different gas injection parameters. At the same time, the hydrate formation in the wellbore during the gas lift process was analyzed, the step-by-step gas lift process parameters were accurately designed, the indoor corrosion evaluation experiment was carried out, the material of the coiled tubing was optimized, and a deep horizontal well for Daqing Xushen Gasfield was formed. Using the optimized design method of combined tubing gas lift combined drainage, the precise design of process parameters were realized, which can provide technical support for drainage and gas recovery for deep, high-level water production gas.
What problem does this paper attempt to address?