Power Plant Maintenance Scheduling Considering Unit Failures

冯长有,王锡凡,王文博
DOI: https://doi.org/10.3969/j.issn.1006-6047.2009.10.020
2009-01-01
Abstract:A UMS(Unit Maintenance Scheduling ) model of power plant is proposed considering the impacts of unexpected unit failures.The bathtub failure model of generating unit is given,which is used to assess the expected renewal cost.Based on the hybrid energy market model,the impacts of maintenance and failure outage on power producer's potential benefits are analyzed in detail, including the energy-selling profits,expected renewal costs and maintenance costs.Its objective is to maximize the producer's benefits over the scheduling horizon and the solution is obtained by using the genetic algorithms and linear programming method with the consideration of relevant restraints.Numerical examples of a four-unit power plant show its usefulness and practicability.
What problem does this paper attempt to address?