Generation Maintenance Scheduling Based on Minimum Loss of Load Expectation Considering Significant Wind Power Penetration

王海彪,郭瑞鹏,姜忠民,赵舫,范长澜
2013-01-01
Abstract:The randomness and instability of wind power have brought huge pressure to system security. The randomness of wind power may lead to reserve shortage under unreasonable unit maintenance scheduling. This paper introduces a unit maintenance scheduling model to minimize expected loss of load based on wind power probability distribution. Unit maintenance scheduling is reasonably optimized by considering the expected loss of load with respect to random outage of generators, so that the expected loss of load can be decreased or even eliminated to guarantee the safe operation of system. A novel efficient 0-1 particle swarm optimization algorithm is described. Simulation results on IEEE RTS-96 system show the feasibility of the proposed model and the efficiency of the proposed particle swarm optimization algorithm.
What problem does this paper attempt to address?