Application of BP Model to Analyzing Monitoring Data and Forecasting Deformation

CHEN Liang-liang,GUO Hang,GUAN Xiao-yan,DONG Jian-liang
DOI: https://doi.org/10.3771/j.issn.1009-2307.2008.04.042
2008-01-01
Abstract:This paper focuses on the research of the BP neural network models.The BP forecasting models have been established,and carried out with the VC++ program for the purpose of analyzing and forecasting the real time monitoring data of the Dong Jiang dam real time.Generally,there are two methods to establish the model.One is based on a continual time series,the other is to use environment variables as independent variables.In the paper,both methods can get good forecasting results,and the accuracy of the second method is higher than that of the first one.
What problem does this paper attempt to address?