The Application of Double BP Neural Network Combined Forecasting Model in Real-time Data Predicting

LI Wei,SHENG De-ren,CHEN Jian-hong,REN Hao-ren,YUAN Zhen-fu,CEN Ke-fa,ZHOU Yong-gang
DOI: https://doi.org/10.3321/j.issn:0258-8013.2007.17.018
2007-01-01
Abstract:As a new data forecasting model,the double BP neural network combined model based on regressive neural network and time-delay neural network was proposed, which has the advantages of nonlinear combined forecasting methods. The model was trained with main steam flow values of one 660MW unit.The calculation results testified that the double BP neural network model improved the forecasting accuracy of a single model.The mean relative forecasting error of checking samples data was 1.5%, while the mean relative forecasting errors of regression neural network and time-delay neural network were 2.7% and 1.9% respectively.It was proved that the double BP neural network combined model had preferable forecasting accuracy and can be applied for validation of real-time data in power plant.
What problem does this paper attempt to address?