Optimization Models and Solution for Multi-Mode Project Payments Scheduling

HE Zheng-wen,XU Yu
DOI: https://doi.org/10.3969/j.issn.1000-5781.2007.05.005
2007-01-01
Abstract:This paper studies the project payment scheduling problem where activities may be performed with several modes.The objective is to find the payment schedule including payment event,payment amount,activity performing mode,and event realization time to maximize project profit.Based on the identification of the problem,two nonlinear mixed integer programming models are constructed from contractor′s and client′s viewpoints respectively.A special simulated annealing heuristics which consists of the module seeking for the desirable payment event set and the module searching for the desirable event schedule is developed.The study′s result is illustrated by using an instance and some conclusions are drawn: The client′s preference on the payment schedule is obviously different from the contractor′s;the latter′s profit ascends with the increase of payment number and payment proportion and the reverse is true to the former;their profits drop with the augment of cash discount rate.
What problem does this paper attempt to address?