Two-Agent Supply Chain Scheduling Problem to Minimize the Sum of the Total Weighted Completion Time and Batch Cost

Li-Ya Yang,Xi-Wen Lu
DOI: https://doi.org/10.1007/s40305-017-0171-5
2017-01-01
Journal of the Operations Research Society of China
Abstract:Two-agent single-machine scheduling problem is considered in this paper. Agent A ’s goal is to minimize the sum of the total weighted delivery time and the total delivery cost, and agent B has the delivery time window. First, the NP-hardness of the general problem is proved, and then two special cases are considered. One case is that A ’s jobs have agreeable ratio and this problem is still NP-hard. A pseudo-polynomial dynamic programming algorithm and a 3/2 -approximation algorithm are designed. In the other case, A ’s jobs have agreeable ratio and B ’s jobs have deadline at the same time. This problem is polynomial solvable.
What problem does this paper attempt to address?