Research on Bill of Materials in Opposite MRP System

钱志昂,张忠能
DOI: https://doi.org/10.3969/j.issn.1000-3428.2004.z1.171
2004-01-01
Abstract:Generally,MRP is an irreversible process, which separates the established MPS into a series of SOs and POs. With this feature, the plan cannot be rearranged quickly and effectively when facing some unexpected changes in the production process. In onder to overcome the limitation; MRP system should be improved to support the method that can set SO according to MPS and modify MPS according to PO. Therefore, a new path that links MRP and MPS should be found to solve the problem in another direction.